Description
Course Name: Certified Metal Inert Gas Welder
Global Occupational Skill Standard – GOSS ID: GOSS/C/CMIGW/V1
Eligibility: 10th (High School) or Equivalent or minimum 2 years of relevant experience (experience-based learners can directly enroll and certify).
Objective: The objective of the Certified Metal Inert Gas (MIG) Welder course is to equip participants with comprehensive knowledge and practical skills to perform MIG welding using inert gas shielding. The course covers welding principles, equipment setup, wire feeding techniques, torch handling, metal types, joint preparation, safety protocols, and weld quality inspection.
Certification: Within 5 days after Completion of Online Assessment.
Get ready to join the Journey to become a GSDCI Certified Professional – International Certification and Assessment Body.
Steps to become a GSDCI Certified Professional:
Step 1: Select your certification you want to pursue.
Step 2: Click on get certified tab, new pop up window will open.
Step 3: Click on pay certification fee, you will be redirected to billing details page.
Step 4: Fill your details and click on pay certification fee, You will be redirected to payment gateway, pay fee by any available options like Card(Debit/Credit), Wallet, Paytm, Net banking, UPI and Google pay.
Step 5: You will get Login Credentials of Online E-Books and Online assessment link on your email id, within 48 hrs of payment.
Step 6: After completion of the online assessment, the soft copy of your certificate will be sent to your registered email ID within 5 days.
Assessment Modules:
Module 1: Introduction to MIG Welding: Overview of MIG welding process, Comparison with other welding methods, Applications of MIG welding, Roles and responsibilities of a MIG welder, Basic welding terminology, Safety standards in MIG welding.
Module 2: MIG Welding Equipment and Consumables: Components of MIG welding machines, Types of welding wires and electrodes, Shielding gases and mixtures, Welding power sources and settings, Equipment setup and maintenance, Troubleshooting common issues.
Module 3: Welding Techniques and Procedures: Setting welding parameters (voltage, wire feed speed, gas flow), Torch handling and angle, Welding positions and joint types, Starting and stopping welds, Controlling bead shape and penetration, Techniques for minimizing defects.
Module 4: Welding of Various Materials: MIG welding on carbon steel, stainless steel, aluminum, and other alloys, Surface preparation and cleaning, Handling different material thicknesses, Preheat and post-weld treatment, Dealing with material-specific challenges, Weld quality assurance.
Module 5: Quality Control and Inspection: Visual inspection of welds, Common welding defects and their causes, Non-destructive testing methods, Documentation and compliance with standards, Repair and rework procedures, Continuous improvement in welding quality.
Module 6: Safety and Environmental Considerations: Personal protective equipment (PPE) requirements, Electrical safety and fire hazards, Ventilation and fume extraction, Safe handling and storage of gases and materials, Waste management and environmental protection, Emergency preparedness and response.
GSDCI Online Assessment Detail:
- Duration- 60 minutes.
- Number of Questions- 30.
- Number of Questions from each module: 5.
- Language: English.
- Exam Type: Multiple Choice Questions.
- Maximum Marks- 100, Passing Marks- 50%.
- There is no negative marking in any module.
| Marking System: | |||
| S.No. | No. of Questions | Marks Each Question | Total Marks |
| 1 | 10 | 5 | 50 |
| 2 | 5 | 4 | 20 |
| 3 | 5 | 3 | 15 |
| 4 | 5 | 2 | 10 |
| 5 | 5 | 1 | 5 |
| 30 | 100 | ||
| How Students will be Graded: | |||
| S.No. | Marks | Grade | |
| 1 | 91-100 | O (Outstanding) | |
| 2 | 81-90 | A+ (Excellent) | |
| 3 | 71-80 | A (Very Good) | |
| 4 | 61-70 | B (Good) | |
| 5 | 50-60 | P (Pass) | |
| 6 | 0-49 | F (Fail) | |
Benefits of Certification:
1. Global Recognition & Credibility – Stand out worldwide with a certification that opens doors across borders. Trusted by employers, respected by institutions, and recognized in over 100 countries.
2. Quality Assurance through ISO Certification – Certified to global ISO standards, our programs deliver excellence, consistency, and a benchmarked learning experience that speaks for itself.
3. Career Advancement & Employability – Enhances your resume and increases chances of promotions or job offers.
4. Non-Profit Trust Factor – Certifications from non-profit organizations are mission-driven rather than profit-driven.
5. Access to Verified Learning & Resources – Often includes e-books, mock tests, and online support without hidden costs.
6. Transparency & Online Verification – Certifications come with a unique Enrolment ID for easy online verification by employers and institutions.
7. Lifetime or Long-Term Validity – Certifications usually have lifetime validity or long-term recognition, reducing the need for frequent renewals.





Reviews
There are no reviews yet.